9 July, 2024
Electrical lines to the Adbri Birkenhead manufacturing facility were switched off by SA Power Networks this afternoon due to a line fault in their system.
This resulted in a total plant outage and short-term higher than usual emissions from the stack.
We will provide an update once power has been restored.